CamDo Solutions
68 Case Studies
A CamDo Solutions Case Study
CamDo Solutions provided a construction time-lapse solution for Gluyas Motor Group, a family-owned business. The customer's challenge was to document the demolition of their old building and the construction of new workshops and offices. A key difficulty was finding a suitable, stable mounting location for the camera that provided a clear view of the entire site without obstructing operations.
The solution implemented by CamDo involved using a HERO3+ camera paired with their time-lapse intervalometer to capture a 4K photo every 30 minutes during work hours. Despite the mounting challenges, the resulting video successfully captured the project's major milestones and was featured at the building's opening event. CamDo Solutions enabled the creation of a meaningful progress video that celebrated the multi-generational business's evolution.