Case Study: Gluyas Motor Group captures construction progress with CamDo Solutions time-lapse

A CamDo Solutions Case Study

Preview of the Gluyas Motor Group Case Study

Gluyas Motor Group captures construction progress every 30 minutes with CamDo Solutions

CamDo Solutions provided a construction time-lapse solution for Gluyas Motor Group, a family-owned business. The customer's challenge was to document the demolition of their old building and the construction of new workshops and offices. A key difficulty was finding a suitable, stable mounting location for the camera that provided a clear view of the entire site without obstructing operations.

The solution implemented by CamDo involved using a HERO3+ camera paired with their time-lapse intervalometer to capture a 4K photo every 30 minutes during work hours. Despite the mounting challenges, the resulting video successfully captured the project's major milestones and was featured at the building's opening event. CamDo Solutions enabled the creation of a meaningful progress video that celebrated the multi-generational business's evolution.


View this case study…

CamDo Solutions

68 Case Studies