A Cadmatic Case Study
GreenE Waste To Energy S.L., a company that designs and builds turnkey waste-to-energy power plants, faced the challenge of needing a comprehensive software package to manage the design of its highly complex gasification facilities. The company required a solution to connect its 2D and 3D designs with its database to reduce errors.
Cadmatic provided its integrated solution, connecting 2D P&IDs with 3D models and the central database. According to the customer’s Product Development Manager, the use of Cadmatic improved collaboration within the design team and significantly reduced the number of errors made. This resulted in better quality designs and time savings, enabling the company to complete projects on tighter schedules.