Cadmatic
74 Case Studies
A Cadmatic Case Study
Granlund Joensuu, a building technology expert, needed to elevate its electrical design process for complex projects ranging from hospitals to industrial sites. Their challenge was to improve information management and project coordination, moving beyond traditional methods to a modern, modelling-centric approach.
The solution was implemented using Cadmatic Electrical. This tool made 3D modeling an efficient by-product of the design routine and provided unparalleled database and reporting features for documentation. For Granlund, this resulted in the ability to manage enormous amounts of data on large projects and produce thousands of pages of controlled documentation. The centralized SQL Server database also proved invaluable, enabling seamless and efficient remote work for all team members.
Risto Kuosmanen
Project Manager