Bonatti, an international oil & gas general contractor, faced challenges in optimizing construction sequences and visualizing real-time project status for large-scale industrial projects, particularly in remote locations. They needed to improve constructability, track installations and quality control activities like welding, and integrate this data with their corporate systems. To address these challenges, they implemented Cadmatic's eShare information management platform.
The Cadmatic eShare solution provided a digital twin of the plant, using color coding in the 3D model to visualize construction progress, material feasibility, and weld data. This gave site management a superior overview for decision-making compared to traditional reports. The platform's flexibility allowed Bonatti to convert models from various software providers and begin implementation on projects once the design was 30% complete. The solution enhanced operational efficiency, supported workface planning, and is being progressively integrated with Bonatti's corporate project control and document management systems.
Massimiliano Del Rio
Construction Methodologies and Systems Manager