Case Study: Kane Top Group shortens sample development and cuts physical samples with Browzwear 3D software

A Browzwear Case Study

Preview of the Kane Top Group Case Study

Kane Top Group shortens sample development from two weeks to one day with Browzwear

Kane Top Group, a vertically integrated global apparel manufacturer, recognized the need to shift its traditional product development process to digital methods to improve sustainability and efficiency. The company partnered with Browzwear and adopted its VStitcher 3D design technology to address the challenges of a lengthy, costly, and wasteful physical sampling process.

By implementing Browzwear's solution, the design team could identify and amend imperfections instantly using digital prototypes. This allowed Kane Top to shorten its sample development cycle from two weeks to just one day and achieve a 32% reduction in physical samples. The results included a much faster approval cycle and significant cost savings, enabling Browzwear's customer to execute workflows instantly and move toward a greener, less wasteful future.


View this case study…

Browzwear

34 Case Studies