Case Study: 1500 Locust reduces high steam costs with Bright Power’s 75 kW cogeneration system

A Bright Power Case Study

Preview of the 1500 Locust Case Study

Case Study: 1500 Locust - Philadelphia PA - Cogeneration

1500 Locust, a multifamily property in Philadelphia, faced high operating costs from its use of district steam. The vendor, Bright Power, used its EnergyScoreCards service to analyze the property's utility bills and identified that a cogeneration system could be a significant investment to reduce these expenses.

Bright Power managed the entire project, from an initial feasibility study to designing the system and managing the competitive bid process. The solution involved installing a rooftop-mounted 75kW cogeneration system, which replaced the steam used for domestic hot water and offset electric usage with cheaper on-site power. The project is projected to save $94,500 annually, with an additional $34,500 in utility incentives.