J.Assy, a Brazilian agricultural implements company, faced significant challenges in managing its production and tracking products. They relied heavily on spreadsheets for material purchases and controlling serial-numbered items, which made scaling production and controlling raw material delivery difficult. Boyum IT Solutions addressed these issues with its Beas Manufacturing and Produmex WMS solutions.
By implementing Beas Manufacturing, Boyum IT Solutions provided J.Assy with advanced production control and MRP capabilities that were not available in their standard SAP system. This solution optimized time and improved management across all areas. The results were substantial, with production and shipping improving by 75% and industrial management (PCP) increasing by 90%, enabling the company to produce and ship quickly with quality on the world stage.