Case Study: GO-PAK Vietnam improves production planning and scheduling with Boyum IT Solutions' Beas Manufacturing

A Boyum IT Solutions Case Study

Preview of the GO-PAK Vietnam Case Study

GO-PAK Vietnam improves its Production Planning and scheduling with Beas Manufacturing

GO-PAK Vietnam, a British manufacturer of plastic kitchenware, faced the challenge of scheduling thousands of work orders while being constrained by limited molds and machines. To address this, they worked with vendor Boyum IT Solutions to implement the Beas Manufacturing solution.

Boyum IT Solutions implemented the Beas APS and manufacturing modules to perform forward and backward schedule calculations. This solution dramatically reduced scheduling time from one week to just 30 minutes, increased production efficiency by 100%, and saved significant planner workload. The vendor's system was highly praised for its efficiency and simplicity, leading to a strong employee acceptance and a recommendation for use in another company factory.


Open case study document...