Bluestar PLM
22 Case Studies
A Bluestar PLM Case Study
Rotork, a global pipeline control systems manufacturer, faced significant challenges in managing engineering data due to its rapid growth and dispersed global teams. Their manual controls were inadequate, and traditional PLM vendors were not able to meet their specific needs. They turned to the vendor Bluestar PLM for a solution that could integrate with their existing Microsoft Dynamics 365 ERP system.
Bluestar PLM implemented its solution directly inside Rotork's Dynamics 365 environment. This provided a unified system for managing product data, creating items, and storing CAD documents. The results included synchronized real-time data globally, improved Bill of Materials accuracy, and a seamless flow of information between engineering and operations teams, which significantly increased efficiency and reduced errors.
Phil Wood
Chief Information Officer