Case Study: Hannibal Industries achieves faster, standardized product configuration with Bluestar PLM

A Bluestar PLM Case Study

Preview of the Hannibal Industries Case Study

Hannibal Industries is a leading pallet rack and steel tube manufacturer that employs around 400 people at its plants in Los Angeles and Houston

Hannibal Industries, a pallet rack and steel tube manufacturer, faced challenges maintaining its in-house product configurator after a key employee departed. This led to difficulties creating accurate CAD drawings and inefficient data flow between engineering and operations. They sought a new solution integrated with their Microsoft Dynamics ERP system and turned to Bluestar PLM for its Product Configurator (CFG).

Bluestar PLM implemented a stable and easy-to-use configurator that was fully integrated with the existing ERP system. The implementation was completed in just 2.5 months. The solution automated design processes, and a key measurable result was the ability to both configure a part and create its CAD drawing in approximately 90 seconds, drastically improving accuracy and efficiency for Hannibal Industries.


View this case study…

Hannibal Industries

Farooq Mohammad

Director of IT


Bluestar PLM

22 Case Studies