A BlueAlly Case Study
An aerospace research and development center faced rising operational costs and an IT infrastructure that could not keep pace with the data demands of NASA's space exploration missions. They needed to maximize compute density and memory while enhancing reliability and disaster recovery capabilities but lacked the internal staff to complete the complex project. They partnered with BlueAlly to redesign their infrastructure.
BlueAlly implemented a solution using HPE's composable infrastructure platform and Intel's advanced memory, which maximized virtual machine density and increased memory per server blade at a lower cost. This provided the customer with greater computing power, enhanced disaster recovery with automated failover, and robust security. The solution resulted in significant cost savings, ensured operational continuity, and enabled the center to reliably support NASA's critical mission requirements.
An Aerospace Research and Development Center