Case Study: Ford Motor Company achieves 500x faster requirements rewriting with Blue Orange Digital

A Blue Orange Digital Case Study

Preview of the Ford Motor Company Case Study

Ford Motor Company rewrites 13,000 engineering requirements in 4 hours with Blue Orange Digital

Ford Motor Company faced a significant challenge when migrating hundreds of thousands of engineering requirements into JAMA, as each one had to be manually rewritten by an engineer to meet INCOSE and EARS standards. This process was extremely time-consuming, taking approximately 10 minutes per requirement and totaling an estimated 2,170 hours of skilled work for a single batch of 13,035 requirements.

Blue Orange Digital built a private LLM pipeline on Ford's Azure tenant to automate the rewriting and scoring process. The solution rewrote requirements to the correct standards and used a semantic similarity model to prevent meaning drift, completing a batch of 13,035 requirements in just 4 hours instead of 2,170 hours. This resulted in a 500x faster process for Ford, dramatically accelerating their migration while ensuring data remained secure within their private cloud.


View this case study…

Blue Orange Digital

49 Case Studies