Case Study: Medtronic cuts energy costs and carbon emissions with Bloom Energy

A Bloom Energy Case Study

Medtronic cuts campus power needs by 96% with Bloom Energy

Medtronic, a global leader in medical technology, sought to reduce energy costs and environmental impacts at its Santa Rosa R&D campus while working toward a corporate carbon reduction goal. The company engaged Bloom Energy to implement a more reliable and sustainable on-site power solution.

Bloom Energy installed a 400 kW system using its highly efficient fuel cell technology to provide primary power. This solution from Bloom Energy now supplies 96% of the building's electricity, is estimated to save $2.3 million over 15 years, and has reduced the site's carbon emissions by 19%.