Case Study: Tideway East reduces PPE and small tools costs with Biosite Systems

A Biosite Systems Case Study

Preview of the Tideway East Case Study

Safer workers and reduced costs for Thames Tideway East

The customer, Tideway East, a joint venture working on the Thames Tideway tunnel project, faced challenges in managing worker competencies and controlling spiraling costs for PPE and small tools. They partnered with vendor Biosite Systems to implement its competency management software to address these issues.

Biosite Systems' solution provided a centralized system to track worker training and manage assets. Using the software's Asset module, Tideway East gained control over its stores, ensuring only qualified workers could access certain equipment. This implementation by Biosite saved Tideway East up to 25% in PPE and small tools costs compared to other project sections not using the module.