Case Study: CÉH reduces clash correction time by 40% with BIM Track

A BIM Track Case Study

Preview of the CÉH Case Study

How BIM Track Solved CÉH’s Need for Clash Detection Workflow Optimization

CÉH, an engineering firm with over 240 engineers, faced significant challenges in their clash detection workflow for a major hospital project. While using Autodesk Navisworks, their manual process of distributing HTML reports via email was inefficient, leading to overlooked clashes, poor tracking, and cumbersome communication. To optimize this workflow, they turned to the vendor BIM Track for a solution.

By implementing BIM Track's web-platform, CÉH created a centralized hub for managing clash detection issues. The solution streamlined communication by directly linking clashes to the model, eliminating the need for manual reports and making it easy to track progress. According to their BIM Manager, BIM Track reduced the time spent correcting clashes by 40% and completely eliminated the recurrence of overlooked issues.


Open case study document...

CÉH

Balázs Tudlik

BIM Manager


BIM Track

18 Case Studies