BIM Track
18 Case Studies
A BIM Track Case Study
Boustead Projects Limited faced significant inefficiencies in its Building Information Modeling (BIM) coordination for the 351 on Braddell industrial development. Managing thousands of issues across disciplines was a manual, time-consuming process that lacked automated notifications, made reporting tedious, and provided no easy way to track or visualize issue status and locations. The BIM team spent hours manually compiling reports in spreadsheets and PowerPoint.
BIM Track provided the solution with its issue tracking platform, which integrated directly with the team's design software like Revit and Navisworks. This allowed for real-time issue location, management, and automated report generation. The implementation saved 98% of the time previously spent creating reports, drastically improved coordination meeting productivity, and provided a clear, organized overview of all project issues. Boustead Projects E&C's BIM coordinators reported a significant improvement in workflow efficiency and better issue tracking.
Sri Rahayu
BIM Coordinator