BXP, one of the nation's largest developers and managers of premier workplaces, faced rising energy costs and poor efficiency due to a low Delta T issue in the chilled water system at its Four Embarcadero Center office tower. The 40-year-old system provided no visibility into performance, leading to unstable flow and wasted energy. To address this, BXP worked with its controls partner and Belimo to implement a solution using the Belimo Energy Valve.
The solution involved retrofitting six air-handling units with Belimo's IoT-connected Energy Valves, which converted the system to pressure-independent operation and provided real-time data on flow, temperature, and energy use. This data was later crucial in identifying and fixing a faulty bypass valve that was wasting chilled water. Post-retrofit, the system achieved a consistent 14 °F Delta T, used 53% less chilled water, and reduced overall chiller plant energy use by 28%, saving approximately $131,000. Belimo's technology provided the intelligence and visibility needed to optimize the historic building's efficiency.