BearingPoint
192 Case Studies
A BearingPoint Case Study
The BMW Group faced challenges in its electrics/electronics development process due to increasing vehicle complexity and inefficient data exchange methods. This led to inconsistencies that hampered development cycles. To address this, BMW engaged BearingPoint to establish a high-quality data foundation and achieve digital continuity.
BearingPoint implemented a central master data hub, which involved the functional conceptualization and technical integration with over 70 IT systems. The solution harmonized and distributed data across departments, streamlining exchange and improving data quality. As a result, BMW Group achieved increased efficiency, a shortened time-to-market, and a simplified IT landscape with reduced development costs.