BASF worked with Lagre Mining Plant in Russia to improve the performance of its phosphate flotation process and meet new environmental regulations coming into force in Europe. The plant needed a better collector solution, and BASF evaluated products from its Lupromin® range to find a suitable replacement.
BASF tested and validated the Lupromin® collector in the lab and in plant trials before full-scale rollout, then further improved it into a single all-season product. The result was a 2.5% increase in phosphate recovery, CO2 emissions reduced by 2.5% per ton of phosphate produced, about €6 million in annual financial benefit, 40% lower reagent dosage than the previous product, reduced tailings, and improved health and safety through the use of a phenol-free product.
Lagre Mining Plant in Russia