DeepShield deepwater subsurface safety valve saved operator more than $1 million USD in GOM project

A Baker Hughes Case Study

Preview of the DeepShield Case Study

Case study about DeepShield working with Baker Hughes.

Open case study document...

Baker Hughes

14 Case Studies