Baker Hughes ESPs improved run time 150% year over year, saved operator $14 million USD annually

A Baker Hughes Case Study

Preview of the Large Gas Volumes Case Study

Case study about Large Gas Volumes working with Baker Hughes.

Open case study document...

Baker Hughes

14 Case Studies