Case Study: Lane Bryant cuts POS costs and inventory with Baesman’s Sign Ordering System

A Baesman Case Study

Preview of the Lane Bryant Case Study

That’s what our SOS system did for Lane Bryant's POS fulfillment

Lane Bryant partnered with Baesman to fix a disorganized POS fulfillment process that was being managed manually, creating high costs, excess inventory, waste, and a heavy time burden on store and marketing teams. The retailer needed a faster, more controlled way to manage sign ordering and replenishment across stores.

Baesman implemented its automated, turnkey Sign Ordering System™ (SOS™) along with custom kit packaging services to streamline ordering, enforce store limits, and improve approval workflows. The result was a 50% reduction in program cost, nearly 50% lower freight and warehousing costs, and a 90% reduction in in-store POS inventory, while also improving order accuracy and giving stores real-time low-stock alerts.


Open case study document...

Lane Bryant

Cyndi Boblett

Print Production Director


Baesman

9 Case Studies