Dubai Mall required a better understanding of water flow within its chillers to optimize cooling services and improve energy efficiency in its hot climate. To meet this challenge, they worked with Badger Meter to implement Dynasonics TFX-5000 clamp-on ultrasonic flow meters.

The solution from Badger Meter provided a non-invasive way to measure flow without system shutdowns, integrating data directly into the mall's building management system. This resulted in reduced operational costs and energy consumption, enhanced comfort for visitors and tenants, and eliminated the need for maintenance due to the meter's lack of moving parts.