A Badger Meter Case Study
A children’s hospital in the United States needed to modernize its inefficient HVAC infrastructure to meet stricter environmental regulations and improve indoor air quality. To address this challenge, the hospital worked with Badger Meter to install ModMAG M2000 electromagnetic and Dynasonics TFX-5000 ultrasonic clamp-on flow meters for precise monitoring of its chilled water systems.
The solution from Badger Meter provided direct digital flow measurement, which replaced less accurate pressure-based methods and enabled seamless integration with the hospital’s building management system. This resulted in improved precision and efficiency for the heating and cooling systems, leading to greater control, lower operating costs and a reduced risk of downtime.