Case Study: EPRI achieves 1.3 TB full-fidelity SharePoint migration in six months and 98% faster granular restores with AvePoint's DocAve

A AvePoint Case Study

Preview of the EPRI Case Study

EPRI Shortens time to Complete Full Fidelity 1.3 TB Microsoft® SharePoint® Migration by One Year and Gains Granular Backup and Restore with DocAve®

The Electric Power Research Institute (EPRI), a nonprofit R&D organization serving the electricity industry, needed to upgrade its SharePoint 2010 intranet and a highly customized external member portal to SharePoint 2013. The complexity of the environment and SharePoint’s limited native backup/restore capabilities made the migration and protection work impractical without a third‑party solution.

EPRI deployed AvePoint’s DocAve Migrator and DocAve Backup & Restore, performing staged, automated migrations into a parallel test environment to move 1.3 TB of content—including metadata and customizations—in six months (about one year faster than native methods). DocAve also enabled scheduled platform and granular backups and item-level restores in roughly 10 minutes (98% faster), minimizing user disruption and simplifying ongoing protection.


Open case study document...

EPRI

Christopher Plunkett

Senior Systems Architect


AvePoint

159 Case Studies