Case Study: Dura Vermeer achieves safer construction design reviews with Autodesk Workshop XR

A Autodesk Case Study

Preview of the Dura Vermeer Case Study

Dura Vermeer reduces time to construction by 25% using Autodesk BIM and design collaboration tools

Dura Vermeer, a leading construction company in the Netherlands, wanted a better way to improve safety and collaboration during design and construction reviews. Before adopting Autodesk Workshop XR, their VR workflows were time-consuming, relied on multiple intermediate tools, and often led to unsynchronized models and limited confidence in the source of truth.

Using Autodesk Workshop XR within Autodesk Construction Cloud, Dura Vermeer can open updated models directly in VR, run more thorough safety and design reviews, and record issues in one platform. The solution helped eliminate the risk of outdated models in VR, reduced the need for third-party applications, and enabled the team to identify hazards earlier and make sites safer before construction begins.


View this case study…

Dura Vermeer

Sander de Zee

BIM Manager


Autodesk

170 Case Studies