Autodesk
170 Case Studies
A Autodesk Case Study
Tiong Seng Contractors, a Singaporean construction firm, faced a significant challenge in constructing the hybrid Kallang Polyclinic and Long-Term Care Facility. The project's complexity, with its different building purposes and multiple stakeholders in the decision-making process, required a seamless feedback cycle to meet project milestones. To address this, they turned to vendor Autodesk for a digital collaboration solution.
The solution implemented by Autodesk involved creating a 3D digital project model presented in a virtual reality (VR) environment. This immersive tool allowed all stakeholders to visualize the design and provide real-time feedback, making collaboration seamless. As a result, Tiong Seng Contractors saw a 33% improvement in resolving coordination issues, reduced the number of prefabricated components needed, shortened the construction timeline by 25%, and saved the project more than 5,000 hours.
Edwin Lee
Business Unit Head