Autodesk Construction Cloud
116 Case Studies
A Autodesk Construction Cloud Case Study
Influit Production Solutions, a UK-based general contractor serving the oil and gas industry, needed a better way to collaborate across teams in the UK, Indonesia, Iraq, and beyond. Their design and engineering teams were struggling with manual markup processes, email-based document sharing, and confusion over the latest drawing revisions, which created risk in a safety-critical environment. To address this, Influit adopted Autodesk Construction Cloud’s BIM 360 for construction document management and project collaboration.
With Autodesk Construction Cloud and BIM 360, Influit enabled real-time access to the same documents, drawings, and models across global teams and even customers, improving version control, accountability, and trust. The solution reduced mistakes, saved time, and made remote collaboration far more efficient; one team member’s markups could travel 6,987 miles instantly, and the company has since expanded use of the platform across additional projects and stakeholders.
Paul Rafferty
Piping Designer