Autodesk BIM 360
97 Case Studies
A Autodesk BIM 360 Case Study
McCarthy Building Companies faced slow, costly design buy-in on the complex Providence Tarzana Medical Center project, where traditional physical mock-ups and drawing reviews delayed approvals and drove revisions past $80,000. To accelerate stakeholder reviews and catch discrepancies between architect designs and as‑built conditions, McCarthy turned to Autodesk BIM 360 along with its EBA-supported Revit/3ds Max workflow and AR/VR hardware.
Using Autodesk BIM 360 Docs to stream models to DAQRI headsets and a VR pipeline through Revit, 3ds Max, and Unreal Engine, McCarthy produced immersive VR/AR experiences (about 30 renderings) that secured full stakeholder approvals in three days versus seven weeks and completed final designs in four weeks. The VR program cost $36,900—less than half the prior mock-up revision cost—and AR checks found a one‑foot as‑built error that would have cost an estimated $20,000 to fix, demonstrating clear time and cost savings enabled by Autodesk BIM 360.
Jordan Moffett
Virtual Design and Construction Manager