Case Study: IMC Construction achieves 40% faster quantity takeoffs with Autodesk BIM 360

A Autodesk BIM 360 Case Study

Preview of the IMC Construction Case Study

How IMC Construction Reduced Quantity Takeoff Time by 40%

IMC Construction, a <500‑employee general contractor based in Malvern, PA, faced slow, error‑prone quantity takeoffs and difficulty tracking design changes—relying on tedious Revit-to-Excel exports and manual drawing overlays. To address this, IMC turned to Autodesk BIM 360, deploying Assemble within the Autodesk Construction Cloud for cloud‑based quantification and model conditioning to centralize and visualize model data.

Using Autodesk BIM 360’s Assemble plus Power BI integration (and Navisworks filtering), IMC standardized model data, created dashboards and templated quality checks, and enabled field-friendly reporting. The result: quantity takeoff time cut by 40%, variance reports produced 70% faster, trending reports 40% faster, and measurably improved collaboration, schedule updates, and payment review processes.


Open case study document...

IMC Construction

Peter Gehring

Director of VDC


Autodesk BIM 360

97 Case Studies