Autodesk BIM 360
97 Case Studies
A Autodesk BIM 360 Case Study
BLOX, the sister company of GA Studio, is a family-owned architecture and design firm that scaled into a national leader in prefabricated healthcare construction. Facing rising complexity, cost pressures, and skilled labor shortages, BLOX adopted a data-driven Design‑Manufacture‑Construct approach and integrated Autodesk BIM 360 to power its WEVR platform and unify design, regulatory rules and stakeholder feedback into manufacturable standards.
Using Autodesk BIM 360, the WEVR platform applies AI and data mining to create standardized SKUs and drive prefabrication workflows (including BLOX’s “Uber” modules and Boeing-inspired chunking). The results are dramatic: design time fell from 365 to 45 days, manufacturing from 100 to 40 days, at least a 25% reduction in waste, and reported 2x improvements in quality, speed and value; demand for Ubers has grown 200%. Autodesk BIM 360 enabled the connected data and collaboration that made these measurable gains possible.
Chris Giattina
Chief Executive Officer