Autodesk BIM 360
97 Case Studies
A Autodesk BIM 360 Case Study
Dura Vermeer, a family‑owned Dutch construction and engineering company, aimed to become one of the most digitized and high‑performing builders in the Netherlands. To cut failure costs, improve subcontractor collaboration, and reduce time spent on 3D BIM model control and coordination, Dura Vermeer selected Autodesk BIM 360 and deployed Autodesk BIM 360 Design across its projects.
Working with Autodesk BIM 360, Dura Vermeer ran a proof of concept, scaled to full projects, and trained subcontractors on Autodesk BIM 360 Design integrated with Revit and BIM 360 Docs. The solution cut design re‑work and failure costs, enabled real‑time project setup that saves weeks of IT and project office effort, and delivered a measurable 25% average reduction in time to construction, while speeding onboarding so teams can implement the workflow in days.
Sander de Zee
BIM Manager