Case Study: BOND Brothers achieves 25% faster project completion and enhanced field quality and safety with Autodesk BIM 360

A Autodesk BIM 360 Case Study

Preview of the BOND Brothers Case Study

BOND takes BIM into the field to enhance quality and safety on its civil and utility projects

BOND Brothers, a New England construction firm founded in 1907, faced challenges delivering safe, high‑quality civil and utility work where underground documentation is often incomplete. To give field teams faster checklists, better issue tracking, and more office visibility, BOND Brothers adopted Autodesk BIM 360 Field from vendor Autodesk BIM 360 to take BIM into the field on mobile devices.

Using Autodesk BIM 360 Field, supervisors ran roughly 40 key quality and safety checklists on iPads, linked photos to 3D models, and eliminated paper re‑entry—saving about 45 minutes per day on data entry. The cloud collaboration helped resolve issues faster and contributed to finishing a gas pipeline maintenance job in six days instead of eight (about 25% faster), improved as‑built documentation and reporting, and strengthened BOND Brothers’ ability to win and manage projects.


Open case study document...

BOND Brothers

Chris Fogg

Virtual Design and Construction Manager


Autodesk BIM 360

97 Case Studies