Case Study: C&R Electric achieves 50% faster raceway modeling with Augmenta

A Augmenta Case Study

Preview of the C&R Electric Case Study

C&R Electric cuts raceway modeling time 50% with Augmenta

C&R Electric faced the challenge of scaling their manual conduit routing and coordination processes for increasingly complex construction projects. Their VDC team was spending six to eight weeks on modeling, a process that was tedious, prone to errors, and led to coordination clashes with other trades. To address this, they turned to the Augmenta Construction Platform (ACP) from vendor Augmenta.

By implementing Augmenta's AI-powered solution, C&R Electric automated the routing and coordination of electrical raceways. This integration into their Revit workflow generated clash-free models in hours instead of weeks. The results were significant: on two elementary school projects, the company saved over 320 hours, reduced modeling time by 50%, and cut material waste by 15%. The solution also allowed their prefab shop to be ready a full month earlier.


View this case study…

Augmenta

3 Case Studies