Case Study: Miller Electric reduces electrical modeling time by 40% with Augmenta

A Augmenta Case Study

Preview of the Miller Electric Case Study

How Miller Electric Reduced their Modeling Time by 40%

Miller Electric Company, an established electrical engineering firm, faced industry challenges including a complex, time-consuming process for designing electrical raceway systems and a shortage of experienced design talent. To address these issues, they partnered with vendor Augmenta to pilot the Augmenta Construction Platform's automated Electrical Design Module.

The solution involved using Augmenta's software to retroactively automate the design of electrical conduit systems on historical projects. This pilot resulted in Miller Electric realizing approximately 40% time-savings in electrical modeling time, which is the equivalent of adding 2-3 BIM team members' capacity without increasing overhead costs. Augmenta's platform also provides capabilities for estimating material and labor costs, helping the company maintain a competitive edge.


Open case study document...

Miller Electric

Adam S. Davis

Sr. Manager of Fabrication & Modularization


Augmenta

1 Case Studies