The customer, XTO Energy, required engineering, procurement, construction management, and fabrication services for its Owl CDP gas processing facility in Texas. Audubon was appointed to provide EPCM and fabrication solutions to design and build the facility in two phases, expanding its capacity to process 150,000 barrels of oil per day.
Audubon delivered a comprehensive solution that included detailed engineering, project management, fabrication of modular units, construction oversight, and commissioning. The result was the successful two-phase construction of the central delivery point, which achieved its goal of significantly increasing oil processing capacity for XTO Energy. Audubon also provided PSM compliant operating procedures for the completed facility.