NuBlu Energy required a new liquefied natural gas facility to be built in Port Allen, Louisiana. The greenfield project involved the engineering, fabrication, and construction of a complete plant with gas treating, compression, storage, and truck loading capabilities.

Audubon provided a full-scope solution, including multi-discipline engineering, project management, fabrication of equipment packages, construction management, and commissioning. The result was a successful 40,000-gallons-per-day LNG facility for NuBlu Energy. A key feature of the plant designed by Audubon is its modularity, allowing for future expansion to 90,000 GPD as regional demand increases.