Case Study: a natural gas infrastructure operator boosts compressor capacity with Audubon EPC services

A Audubon Case Study

Preview of the Natural Gas Infrastructure Operator Case Study

natural gas infrastructure operator expands 30-in and 24-in pipeline ties with Audubon

The natural gas infrastructure operator required a full engineering, procurement, and construction (EPC) solution to expand its Green River compressor station in Wyoming. The challenge involved increasing compression capacity for an interstate pipeline while integrating new systems with existing equipment and working under extreme cold-weather conditions. They engaged vendor Audubon to deliver this comprehensive design-build project.

Audubon implemented the solution by installing Solar Turbines compression equipment and on-site power generation systems. They managed all aspects of the project, from civil work and piping fabrication to electrical system integration and final tie-ins with the pipeline network. The vendor's self-performed construction and collaborative approach ensured the expansion was completed with high levels of quality, efficiency, and compliance, successfully boosting the client's natural gas delivery capacity across the US.


View this case study…

Audubon

76 Case Studies