Case Study: a natural gas infrastructure operator energizes NGL hub in 5 months with Audubon EPC

A Audubon Case Study

Preview of the Natural Gas Infrastructure Operator Case Study

natural gas infrastructure operator energizes NGL hub in 5 months with Audubon

A natural gas infrastructure operator faced the challenge of losing its energization source for a new greenfield NGL pumping station in South Texas. After setbacks to its original electrification plan, the customer required an expedited, full-EPC solution for its high-voltage power infrastructure and sought the expertise of Audubon.

Audubon implemented a two-phase solution, first prioritizing a temporary mobile substation and transmission line to get the site energized without delay. The company handled all engineering, procurement, and construction, overcoming supply issues and reusing existing materials to save time and cost. Audubon delivered the initial phase in just five months, enabling the facility to begin operations. The permanent substation was completed within 15 months, providing the client with reliable power for its critical infrastructure.


View this case study…

Audubon