MedcoEnergi contracted Audubon for a comprehensive solution to engineer and build the Kayra Sentosa greenfield gas-processing plant in Indonesia. The project required detailed engineering, procurement, fabrication, and commissioning services for a facility designed to handle 100 MMSCFD of natural gas.
Audubon implemented a full-scope EPC solution, applying a modular approach for all processing units which were fabricated and shop-tested in-house before installation. After Audubon's detailed engineering and implementation, the plant was successfully brought online, enabling it to produce truckable condensate, pipeline-quality sales gas, and natural gas liquid (NGL) products.