Audubon
76 Case Studies
A Audubon Case Study
LLOG Exploration required subsea tiebacks for its Blue Wing Olive and Red Zinger fields to its Delta House platform in the Gulf of Mexico. The challenge involved complex topsides modifications to integrate the new fields, requiring engineering, design, and construction management to meet stringent USCG and BSEE regulations.
Audubon provided multidisciplinary EPCM services for this project, handling engineering, design, procurement, and construction management. Their solution included designing high-pressure systems, integrating new equipment, and ensuring regulatory compliance. By executing both tieback projects simultaneously, Audubon delivered greater engineering and construction efficiencies for LLOG.