Case Study: Chevron Pipe Line Co. achieves confident 80-mile pipeline construction with Audubon survey and permitting

A Audubon Case Study

Preview of the Chevron Pipe Line Co Case Study

Chevron Pipe Line Co completes 80-mile pipeline survey and permitting with Audubon

Chevron Pipe Line Co. engaged Audubon for pipeline survey and permitting on its Port Arthur Line Optimization (PALO) project. The challenge involved an 80-mile pipeline route in East Texas, requiring the removal and installation of pipelines, along with new valve and trap sites, which demanded precise surveying and extensive environmental and nonenvironmental permitting.

Audubon evaluated existing data, established benchmarks using leading technologies, and completed all necessary permitting. The solution included supplying as-built survey data, alignment sheets, and over 90 horizontal directional drill drawings. Audubon's precise data management ensured material traceability, enabling confident construction and startup for Chevron’s project.


View this case study…

Audubon

76 Case Studies