Case Study: Chevron Phillips Chemical expands US Gulf Coast petrochemical operations with Audubon EPCM support

A Audubon Case Study

Preview of the Chevron Phillips Chemical Case Study

Chevron Phillips Chemical expands ethylene treatment to 400,000-lb/hr with Audubon

Chevron Phillips Chemical required engineering, procurement, and construction management (EPCM) support for a major brownfield expansion at its Targa terminal petrochemical plant in Mont Belvieu, Texas. The project involved adding a new 400,000-lb/hr ethylene-treating unit, underground storage, and pipeline distribution, which needed to be integrated with the site's existing systems.

Audubon provided a full suite of services from initial conceptual study and FEED through detailed engineering, procurement, and construction management. Acting as the procurement agent, Audubon successfully managed the interface with multiple engineering contractors. The project was completed safely with zero recorded accidents over 105,000 man-hours, delivering the new infrastructure for Chevron Phillips Chemical's expansion.


View this case study…

Audubon

76 Case Studies