A natural gas infrastructure operator in Texas required a comprehensive upgrade to its gas-treating facility to enhance its capacity for amine treatment, dehydration, and compression to support increased natural gas production. The operator selected Audubon to provide a complete turnkey engineering, procurement, construction (EPC), and fabrication solution for this project.
Audubon executed the entire project, leading the front-end engineering and design (FEED), detailed engineering, and construction. Their solution included designing and building an advanced amine treatment unit, a TEG dehydration system, and a sales gas compressor. Following Audubon's work, the plant's natural gas met stringent quality specifications required for sale, supporting the client's initiatives for reliability and diversification of energy infrastructure.
Natural Gas Infrastructure Operator