Case Study: Confidential energy infrastructure company achieves PHMSA-compliant LNG pipeline records with Audubon surveying services

A Audubon Case Study

Preview of the Company Case Study

a confidential energy infrastructure company delivers 72-mile LNG pipeline surveying with Audubon

The customer, a confidential energy infrastructure company, required surveying services for a new 72-mile LNG pipeline connector in Louisiana. Their challenge was to perform an as-built survey across diverse and environmentally sensitive terrain while ensuring all records would be traceable, verifiable, and complete to meet PHMSA regulations. They engaged vendor Audubon for its surveying and data management services.

Audubon successfully surveyed the pipeline using advanced imaging technologies to capture highly accurate spatial data. The solution was implemented using Audubon's proprietary data management platforms, AMPM and AIMS, to optimize material tagging and tracking. This created a complete and compliant source of truth for engineering and construction data that the owner will use over the entire life of the asset, establishing a foundation for decades of safer and smarter operations.


View this case study…

Audubon

76 Case Studies