Case Study: a confidential energy infrastructure company achieves reliable 2-Bcf/d LNG compression and metering with Audubon engineering and design

A Audubon Case Study

Preview of the Company Case Study

a confidential energy infrastructure company builds a 2-Bcf/d LNG supply system with Audubon

The customer, a confidential energy infrastructure company, required engineering and design for a new high-capacity 2 billion cubic feet per day (Bcf/d) compression facility and metering stations in Louisiana's challenging Gulf Coast environment. The challenge involved ensuring infrastructure reliability, regulatory compliance, and resilience against storm surges and flooding. Vendor Audubon provided its engineering, design, and turbine-compression expertise to address this need.

Audubon designed the facility using three Solar Titan 130 turbine compression units and incorporated all balance-of-plant equipment. Their solution featured specialized foundation designs and an elevated platform for the metering station to protect against environmental hazards. The Audubon team successfully navigated complex regulatory requirements across multiple agencies, delivering a system that provided reliable, efficient performance and supported the operator's objectives for emissions reduction.


View this case study…

Audubon

76 Case Studies