Case Study: Banpu Energy Australia advances Kerang BESS development with Atlas NextWave

A Atlas Professionals Case Study

Preview of the Banpu Case Study

Banpu advances Kerang BESS development with Atlas Professionals

Banpu Energy Australia faced the challenge of advancing its Kerang Battery Energy Storage System (BESS) project towards construction amidst a highly competitive market for specialist engineering talent. The project required expertise in complex grid connection requirements, technical studies, and EPC tendering to ensure project readiness. Atlas NextWave provided the solution by supplying experienced Project Engineers to support these critical development activities.

The specialists from Atlas NextWave provided engineering capacity for grid connection modelling, battery performance specifications, and construction readiness planning. This support helped Banpu Energy Australia successfully advance the project through a critical stage, strengthening technical governance and preparing it for procurement and construction execution. Atlas NextWave contributed to the progress of an important energy storage project that will support Victoria’s future electricity network.


View this case study…

Atlas Professionals

4 Case Studies