A semiconductor company faced a major challenge after an acquisition left it with over 300 outdated conference rooms across 29 cities. The rooms needed to be upgraded from Cisco to Logitech Rally with Zoom within a ten-week timeline, all without causing any downtime for users and with a requirement for 100% certified e-waste recycling. They partnered with Astreya to achieve this complex transition.
Astreya implemented the upgrade with a meticulously planned approach that included sustainable decommissioning, layered site surveys, and zero-downtime scheduling. The project was completed two days ahead of schedule with zero meeting disruptions. Results included a 69% drop in monthly AV support tickets and a rise in room availability to 99.7%. Astreya also ensured all retired equipment was processed through certified e-waste channels.