Case Study: Nara Lace, Co. Ltd. achieves faster, easier dyeing schedule management with Asprova Production Scheduling System

A Asprova Corporation Case Study

Preview of the Nara Lace, Co. Ltd Case Study

Nara Lace cuts scheduling time to 30–45 minutes with Asprova

Nara Lace, Co. Ltd, a leading manufacturer of curtain lace dyeing, faced significant challenges in production scheduling. Their process heavily relied on a single experienced schedule manager, who manually drafted plans after hours, leading to a heavy workload, inefficient schedules, and an inability to handle inquiries and changes promptly. To systemize this critical function, they implemented the Asprova production scheduling system.

The solution from Asprova Corporation provided a high-speed scheduling engine with a user-friendly graphical interface. This allowed Nara Lace to reduce scheduling time from several hours to just 30-45 minutes, enabled easy schedule adjustments on a Gantt chart, and visually identified equipment loads. The implementation by Asprova allowed even inexperienced personnel to create efficient schedules, reduced bottlenecks in dyeing, minimized waste, and drastically cut the scheduling workload while improving accuracy and responsiveness to customer inquiries.


View this case study…

Asprova Corporation

24 Case Studies