Case Study: Tata Power Company (Coastal Gujarat Power Limited) achieves a streamlined, user-friendly e-Permit-to-Work and faster permit cycles with ASK EHS

A ASK EHS Case Study

Preview of the Tata Power Company Case Study

Tata Power Company - Customer Case Study

Tata Power Company needed to replace a dated, paper-based Permit to Work (PTW) system during the pre-commissioning of its 4,000 MW Mundra project and required an easy-to-use solution that integrated with their SAP (PM) notifications. They engaged ASK EHS to deliver an electronic e-Permit to Work (e-PTW) software that would replicate complex paper processes, handle multiple equipment isolations, and be simple enough for operations staff.

ASK EHS designed and implemented a customized e-PTW system with electronic signatures, SAP integration, on-site training, and full permit lifecycle tracking. The ASK EHS solution has run successfully for 40 months, required minimal user training, cut permit-cycle time significantly, improved resource productivity, and provided transparent real-time tracking of permits and isolations.


Open case study document...

ASK EHS

20 Case Studies